Centenary Celebrations

Home / Event / Centenary Celebrations

During the School Centenary Celebrations, we gave the School Hall a complete overhaul which included the following;

  • Redecorated the inside including changing most of the fittings
  • Repaired the toilet and connected it to good water source
  • Change the windows to aluminium windows
  • Fixed numerous electrical faults

cent2 cent3 cent4 cent cent1